Abuwarda, Z and Hegazy, T (2016) Flexible Activity Relations to Support Optimum Schedule Acceleration. Journal of Construction Engineering and Management, 142(11).

Bayram, S and Al-Jibouri, S (2016) Efficacy of Estimation Methods in Forecasting Building Projects’ Costs. Journal of Construction Engineering and Management, 142(11).

  • Type: Journal Article
  • Keywords: Building project cost; Cost estimates; Neural networks; Grid partitioning algorithm; Reference class forecasting; Regression analysis; Cost and schedule;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001183
  • Abstract:
    This paper investigates the adequacy of some nontraditional approaches to produce realistic forecasts of the final costs of building projects and compare them with forecasts produced by three traditional methods, the unit area costs (UAC), client detailed costs (UPA), and contract sums (CS). As a case study, data of the actual final costs and forecasts produced using the three traditional methods for 420 finished public building projects carried out in Turkey were collected. Based on 75% of the collected data (i.e., 316 projects), three cost models based on UAC, UPA, and CS were established. The remaining 25% of the data (104 projects) were used as control data for testing the accuracies of forecasts produced by the different approaches. Cost forecasts using five nontraditional approaches, namely multilayer perceptron (MLP), radial basis function (RBF), grid partitioning algorithm (GPA), reference class forecasting (RCF), and regression analysis (RA) were then produced and compared with the actual final costs of projects of the control data. The forecasts were compared using four standard error measures: root-mean-square error (RMSE), mean absolute error (MAE), mean absolute percentage error (MAPE), and overall index of model performance (OI). Results of the analysis have shown that although the efficacy of each method to produce forecasts closer to the actual final costs varied depending on the model used, in general however, RCF and RA seem to produce more accurate and realistic forecasts than the other methods. As such the work described in the paper represents valuable contributions to knowledge and practice, firstly because RCF has not been used or tested before for cost forecasting of building projects. Secondly such comparison among the various methods and approaches used has not been found in published literature. Finally the paper provides guidance as to what approach to use at what stage of the project as well as how realistic the expected forecasts are.

Brockmann, C, Brezinski, H and Erbe, A (2016) Innovation in Construction Megaprojects. Journal of Construction Engineering and Management, 142(11).

Carretero-Ayuso, M J, García-Sanz-Calcedo, J and Reyes-Rodríguez, A M (2016) Qualitative and Quantitative Analyses on Project Deficiencies in Flat-Roof Design in Extremadura, Spain. Journal of Construction Engineering and Management, 142(11).

Chancellor, W and Lu, W (2016) A Regional and Provincial Productivity Analysis of the Chinese Construction Industry: 1995 to 2012. Journal of Construction Engineering and Management, 142(11).

Gardner, B J, Gransberg, D D and Jeong, H D (2016) Reducing Data-Collection Efforts for Conceptual Cost Estimating at a Highway Agency. Journal of Construction Engineering and Management, 142(11).

Gosling, J, Pero, M, Schoenwitz, M, Towill, D and Cigolini, R (2016) Defining and Categorizing Modules in Building Projects: An International Perspective. Journal of Construction Engineering and Management, 142(11).

Lee, J (2016) Estimating Cumulative Damages due to Disruptions in Repetitive Construction. Journal of Construction Engineering and Management, 142(11).

Lee, Y, Kim, J and Lee, T S (2016) Topological Competiveness Based on Social Relationships in the Korean Construction-Management Industry. Journal of Construction Engineering and Management, 142(11).

Liang, C, Lu, W, Rowlinson, S and Zhang, X (2016) Development of a Multifunctional BIM Maturity Model. Journal of Construction Engineering and Management, 142(11).

Love, P E D and Smith, J (2016) Toward Error Management in Construction: Moving beyond a Zero Vision. Journal of Construction Engineering and Management, 142(11).

Lv, X and El-Gohary, N M (2016) Discovering Context-Specific Integration Practices for Integrating NEPA into Statewide and Metropolitan Project Planning Processes. Journal of Construction Engineering and Management, 142(11).

O’Connor, J T, Choi, J O and Winkler, M (2016) Critical Success Factors for Commissioning and Start-Up of Capital Projects. Journal of Construction Engineering and Management, 142(11).

Rodríguez-Garzón, I, Martínez-Fiestas, M, Delgado-Padial, A and Lucas-Ruiz, V (2016) An Exploratory Analysis of Perceived Risk among Construction Workers in Three Spanish-Speaking Countries. Journal of Construction Engineering and Management, 142(11).

Seo, J, Lee, S and Seo, J (2016) Simulation-Based Assessment of Workers’ Muscle Fatigue and Its Impact on Construction Operations. Journal of Construction Engineering and Management, 142(11).

Zhou, H W, Zhou, Y H and Zhao, C J (2016) Fault-Response Mechanism of Production System in Concrete-Dam-Construction Simulation. Journal of Construction Engineering and Management, 142(11).